古贤水利枢纽泄水建筑物出口底流消能设计探讨  

Discussion on Underflow Energy Dissipation Design for Release Structure Outlet in Guxian Hydro-complex

在线阅读下载全文

作  者:朱天平[1] 刘新云[1] 任松林[1] 

机构地区:[1]黄河勘测规划设计有限公司,河南郑州450003

出  处:《红水河》2016年第1期18-22,共5页Hongshui River

摘  要:古贤水利枢纽泄水建筑物是典型的高水头、高流速、大流量泄洪工程,在右岸地面厂房方案中,由于地形限制,电站厂房距泄洪排沙洞出口挑坎位置最近仅约100 m,厂房受挑流雾化影响严重,为减轻或避免雾化影响,设计方案中出口消能方式宜考虑底流消能。The release structure of Guxian hydro-complex is a typical example of high head, high velocity and big discharge capacity. Due to terrain restriction, the proposed ground powerhouse on the right bank may be seriously affected by ski-jump atomization for the reason that the shortest distance between the powerhouse and the jet bucket is about 100m only. Therefore, the energy dissipation by underflow is recommended in the optimization design so as to minimize the effect of flood discharging atomization.

关 键 词:古贤水利枢纽 泄水建筑物 消能设计 

分 类 号:TV653[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象