关于高水头压力钢管镇墩结构设计的初步探讨  被引量:5

Study on Structural Design of Anchorage Block for Penstock with High Head

在线阅读下载全文

作  者:刘永智[1] 师广山[1] 张帆[1] 

机构地区:[1]中国电建集团西北勘测设计研究院有限公司,西安710065

出  处:《西北水电》2016年第1期27-32,共6页Northwest Hydropower

摘  要:近年来国际水电项目设计咨询中出现较多的高水头水电站,针对其压力钢管镇墩结构设计的合理性和经济性,以厄瓜多尔德尔西水电站压力管道设计为例,比较了3种设计方案(联合承载方案、考虑初始缝隙方案、加设垫层方案),采用有限元计算分析,结合中国和美国的压力钢管设计规范,对各种方案下镇墩的配筋量、体型及施工难度进行比较,找到一种可行的解决方案。In recent years,lots of hydropower projects with high head come up in overseas design consultancy. Concerning rationality and economy of the structural design of the anchorage block for the penstock,three alternatives( joint bearing,considering initial gap and additional bedding cushion) with the case of Delsi Hydropower Project in Ecuador are compared. By application of the finite element method and in combination with design specification for penstock of China and USA,reinforcement quantity,outline and construction difficulty of the anchorage block each alternative are compared. A feasible solution is obtained.

关 键 词:高水头 镇墩 结构设计 加设垫层 经济性 德尔西水电站 

分 类 号:TV732.41[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象