检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河南省第二建设集团有限公司,河南新乡453002
出 处:《建筑技术》2016年第3期242-244,共3页Architecture Technology
摘 要:某高层双塔楼钢结构连廊总重量1440 t,最大跨度57.275 m,大吨位超长跨钢结构采用整体液压同步提升施工技术。提升吊点位置、桁架临时加固及提升托座利用有限元分析进行方案设计、结构应力、变形分析与监测控制,保证了工程优质按期完成,可供类似工程参考。A high-rise twin tower steel structure corridor has a weight of 1440 ton and the maximum span is 57.275rn long. Synchronous integral hydraulic lifting technique was used for construction of the large-tonnage and super-long span steel structure. Finite element analysis was adopted for scheme design of lifting point, temporary truss strengthening and lifting base, as well as structural stress, deformation analysis and monitoring control, etc., to guarantee successful completion. References were provided for similar projects.
关 键 词:大跨度钢结构 整体提升安装 结构分析 应力监测 变形监测
分 类 号:TU758.15[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229