检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]新疆油田公司工程技术研究院
出 处:《石油机械》2016年第2期97-101,共5页China Petroleum Machinery
摘 要:塔里木油田双台阶水平井的分注工艺无法满足分层注水要求,区块欠注问题严重。为此,设计了双台阶水平井分层注水管柱及其配套工具,并采用Wellcat软件模拟计算出单独注停上层、注停下层时上、下封隔器的受力情况,对伸缩管长度和封隔器剪钉进行配比优化,即上伸缩管控制伸缩距3 m,下伸缩管控制伸缩距1 m,上封隔器解封力108 kN,下封隔器解封力81 kN,满足该区块双台阶水平井200 m^3/d、25 MPa条件下的分层注水。实际应用结果表明,注水管柱及配套工具设计合理,配合钢丝投捞并更换水嘴即可满足双台阶水平井分层注水。Several two?step horizontal water injection wells have been drilled to waterflood thin sand reservoirs in Tarim Oilfield, and all were operated with general water injection, which could not meet the requirements of multilayer water injection, resulting in serious water injection regulation problem?To address the issue, taking multilayer water injection in the Well × × 1 in Tarim Oilfield as objective, a multilayer water injection string and supporting tools for two?step horizontal well has been designed?The forces on the upper and lower packer under wa?ter injection in upper or lower layer have been calculated by using Wellcat?The telescoping tube length and packer shear pin have been optimized?The upper and lower telescopic tube should has telescopic length of 3 m and 1 m re?spectively?The upper and lower packer should have releasing force of 108 kN and 81 kN respectively?The devel?oped string could meet the multilayer water injection in the two?step horizontal wells under the injection rate of 200 m3/d and pressure of 25 MPa?The application results showed that the designed multilayer water injection string for two?step horizontal well is rational and could meet the requirements for multilayer water injection in two?step hori?zontal well with slickline operation for replacing nozzle.
关 键 词:双台阶水平井 分层注水 注水管柱 集成式同心配水器 Wellcat 优化设计
分 类 号:TE934[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.135.182.75