检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]山能集团新汶矿业集团有限责任公司内蒙能源福城矿业有限公司,内蒙古福城016217
出 处:《煤炭技术》2016年第3期81-83,共3页Coal Technology
摘 要:针对新矿集团新巨龙煤矿-800 m水平托顶煤巷道围岩变形破坏严重的问题,通过现场调研,得出了该类巷道变形破坏特征,顶板变形破坏明显高于两帮。基于数值模拟,探讨了托顶煤巷道围岩的塑性破坏范围,提出了高强度锚网索联合支护,确定了支护参数,并将锚网索联合支护应用于现场,取得了较好支护效果,为此类托顶煤巷道的支护设计提供了借鉴。According to the serious problem of Xinwen mining group, Xinjulong coal mine -800 m level of top-coal deformation of surrounding rock, through field investigation, the roadway deformation and failure characteristics is obtained that the characteristics of roadway deformation and roof deformation damage is significantly higher than two sides coal walls.Based on numerical simulation, discusses the range of plastic failure of roadway surrounding rock of the top-coal and puts forward the high strength of anchor wire rope combined support, determines the support parameters, and the applying of anchor wire rope combined support to field application, obtains a good supporting effect, with such caving roadway supporting design provides reference.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145