石材贴覆混凝土梁试体火害承载行为研究  被引量:1

Behavior of Concrete Beams Carrying the Fire Victims Specimen with Stone Veneer Cladding

在线阅读下载全文

作  者:张茜[1] 曾昭蓉 念红芬[1] 

机构地区:[1]攀枝花学院,攀枝花617000

出  处:《硅酸盐通报》2016年第2期432-436,共5页Bulletin of the Chinese Ceramic Society

摘  要:本试验研究各种石材在各种火害的情况下,石材对混凝土的保护效果,石材施工方法使用湿式贴法,温度则考虑常温(25℃)以及火害温度500℃、700℃与900℃,火害延时皆为30 min。然后以25顿MTS材料试验机进行混凝土梁四点抗弯试验,研究结果显示,火害温度500℃、700℃与900℃后,无论任何石材贴覆之混凝土梁强度皆高于火害后的纯混凝土梁。The test study of various kinds of stone in the case of fire victims, stone protective effect of concrete, stone construction method using a wet paste method, the temperature is considered normal temperature (25 % ) and thermal damage temperature 500 ℃, 700 ℃ and 900℃ fire victims are all 30 min delayed. Then 25 Dayton MTS material testing machine concrete beam four-point bending test, the results showed that the fire damage temperature 500℃, after concrete beam intensity stone veneer cladding of the fire victims 700℃ and 900 ℃, regardless are higher than the pure concrete of any beam.

关 键 词:火害 混凝土梁 石材 抗弯试验 

分 类 号:TD985[矿业工程—选矿]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象