检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国电建集团成都勘测设计研究院有限公司,四川成都610072 [2]四川大学,四川成都610072
出 处:《水力发电》2016年第3期31-34,共4页Water Power
摘 要:结合黄金坪水电站枢纽整体设计要求,考虑其地形地质条件的限制,对其消能形式和体形进行了优化研究,提出了新型掺气型阶梯消能方式。通过试验对原设计方案、比选方案及推荐方案进行了对比研究,结果表明,推荐方案不仅消能更加充分,下游冲刷较轻,整个枢纽泄洪运行调度更加方便灵活,而且可减少开挖和防护工程量,节省工程投资。Based on the overall design of Huangjinping Hydropower Station project and by considering the limitation of topographic and geologic conditions, the form and shape optimization of energy dissipater of discharge structures are studied. A new pre-aerator stepped energy dissipator is finally proposed. Many experiments are carried out to compare the original designed scheme, alternative scheme and proposed scheme. The results show that the proposed scheme can not only make the energy dissipation more effective, the downstream erosion less and the flood control scheduling more convenient and flexible, but also can reduce the amount of excavation and protection engineering and save project investment.
关 键 词:掺气型阶梯消能工 消能防冲 优化设计 模型试验 黄金坪水电站
分 类 号:TV65[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7