检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广东工业大学土木与交通工程学院,广东广州510006 [2]中水珠江规划勘测设计有限公司,广东广州510507
出 处:《人民黄河》2016年第3期96-99,共4页Yellow River
摘 要:对东莞市东江与水库联网工程进行研究,找到最佳江库联网方案。首先采用模糊综合评判理论,利用水质等6项评判指标对三个取水方案进行比选,然后利用供水保证率等5项指标对联网线路进行优选。结果表明:沙角取水口与松木山水库相联的取水方案相对优属度最大,是最优取水方案;由松木山水库分东西两线联接形成环状闭合联网方式的相对优属度最大,是水库最优联网方式。模糊综合评判理论得到的结果能综合考虑供水保证率、环境影响、投资等多方面因素的影响,全面反映复杂的工程实际情况,取水方案和联网方式的优化结果与项目实际采用的方案一致。Researches were conducted on the collaborative work of river and reservoir project in Dongguan to find out the best scheme of the collaborative work. Based on fuzzy optimization theory, six evaluation criteria such as water quality were used to evaluate the pumping site first and then the pipelines were optimized by guarantee rate et al. five criteria. The results show that the best pumping site scheme is Shajiao Pump Station and its connection route to Songmushan Reservoir with the superior ratio of 0. 937, the best pipeline scheme is an enclosed circle line starting and ending at Songmushan Reservoir with the superior ration of 0.972. The results based on fuzzy optimization theory can consider the factors such as water supply guarantee, environment and investment. The optimization result is the same with the result of applied in the project.
关 键 词:江库联网工程 模糊优选决策模型 方案优选 水质 评判指标
分 类 号:TV212[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49