Micromine软件境界优化原理及其在俄罗斯某银铅锌矿露天境界设计中的应用  

The principle of open pit limit optimization based on Micromine software and its application in open pit limit design of a silver-lead-zinc in Russia

在线阅读下载全文

作  者:王宝山[1] 

机构地区:[1]中冶长天国际工程有限责任公司矿业工程技术公司,湖南长沙410007

出  处:《工程建设》2016年第1期30-34,52,共6页Engineering Construction

摘  要:介绍了Micromine软件境界优化的原理和步骤,并对俄罗斯某银铅锌矿中心区进行了露天境界优化,求得了该区最佳露天境界,这种方法大大提高了境界圈定的效率和准确性。在此基础上,为了解决软件境界优化的不足,提出了相应的解决方案。The principle and process of open pit limit optimization based on Micromine software were intro- duced, and the open pit boundary of the central area of a Russian siver-lead-zine mine has been optimized by this method in order to obtain the best open pit limit. This method greatly improves the efficiency and accuracy of the open pit limit determination. On this basis, in order to make up the deficiency of open pit limit optimization by soft- ware, the author proposes his own solution.

关 键 词:Micromine 境界优化 L-G图论法 嵌套露天境界 

分 类 号:TD216[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象