机构地区:[1]青岛理工大学土木工程学院,山东青岛266033 [2]中建三局工程总承包公司山东分公司,山东青岛266033
出 处:《工程建设》2016年第1期67-69,共3页Engineering Construction
摘 要:在大跨度混凝土水平结构的施工过程中,某层混凝土的浇筑过程、上层混凝土的浇筑过程以及该层模板支撑体系的拆除过程,是影响挠度变化的关键。为了精确的对混凝土水平构件的挠度变化进行测量,并保证其在整个施工过程中测量的精度,提出了预埋构件的测量方法。During construction process of large span horizontal concrete structure, the casting process of this layer of concrete ,the casting process of upper layer of concrete and demolition process of this layer of support system of this layer formwork are the key factors influencing the deflection. In order to accurately measure the deflection var- iation of the horizontal concrete members and ensure the measurement accuracy during the whole construction process ,the measurement method of pre-embedded structures members were put forward.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249