祥光二期旋浮吹炼炉生产实践及优化  被引量:3

Production Practice & Optimization of Vortex Floating Converting in Xiangguang Ⅱ Phase Furnace

在线阅读下载全文

作  者:董广刚 何静[1] 

机构地区:[1]中南大学冶金与环境学院,湖南长沙410083 [2]山东阳谷祥光铜业有限公司,山东阳谷252327

出  处:《铜业工程》2016年第1期51-53,61,共4页Copper Engineering

摘  要:祥光铜业一期工程是国内首家采用奥托昆普闪速熔炼+闪速吹炼工艺的铜冶炼厂,2011年二期对接时对吹炼炉进行了改造,将核心设备冰铜喷嘴改为具有祥光自主知识产权的旋流冰铜喷嘴,投产后经摸索创新,克服了喷嘴粘接,耐火材料冲刷,上升烟道粘接等技术难题,生产稳定,生产能力达到了年生产45万t粗铜,着重介绍了旋浮吹炼炉的生产遇到的问题及解决方案,展望了下一炉期检修计划。TheⅠphase of the project in Xiangguang Copper is the first domestic smelter by using the Outokumpu "Flash Smelting and Flash Converting process". The converting furnace was reformed during theⅡphase of the project butted joint successfully in 2011. The core equipment of matte nozzle has beenreplaced by the pulsating vortex nozzle with the proprietary intellectual property rights of Xiangguang Copper. After the commissioning of the exploration innovation, technical problems such as the adhesion on nozzle and the up-shaft outlet of flash furnace, the erosion on refractory etc. were overcomed. With the stability of production, the production capacity of blister copper has reached 450,000 tons annually. The problems occurred during production and solutions in vortex flash converting furnace were emphatically introduced in this article. The next stage of furnace maintenance plan was prospected in this paper.

关 键 词:脉动旋流冰铜喷嘴 喷嘴粘接 耐火材料冲刷 上升烟道粘结 解决方案 检修计划 

分 类 号:TF806[冶金工程—有色金属冶金]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象