检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Bascetin A Tuylu S Adlguzel D Ozdemir O
机构地区:[1]Mining Engineering Departrnent, Engineering Faculty, Istanbul University, Istanbu134413, Turkey
出 处:《Journal of Geological Resource and Engineering》2016年第2期63-72,共10页地质资源与工程(英文版)
摘 要:Tailings are formed as a result of mine processing. When these tailings are left in an environment in an inappropriate manner, they create a danger against the environment and human health. Therefore, the safe disposal of mine tailings above the ground is environmentally quite important. Today, tailing dams are generally used in the disposal of these mine tailings. However, this method has many environmental disadvantages such as AMD (acid mine drainage), heavy metal mobilization etc. For this reason, the use of alternative methods such as surface paste tailing disposal or geotextile methods are gradually increasing in the world. In this study, the advantages and disadvantages of the surface paste tailing disposal method and tailing disposal method using geotextile material compared to the traditional tailing dam method were evaluated in detail, and, the costs of these three methods for a typical Pb-Zn mine establishment were compared. The analysis indicated that the unit costs of the tailing dam, the surface disposal method, and the geotextile method were calculated as 2.25 S/ton, 2.29 S/ton, and 7.39 S/ton, respectively. However, the unit price of surface paste disposal method become 2.79 S/ton when cement was used. The higher cost of the unit price of the tailing disposal method using geotextile method was attributed to the high cost of geotextile material.
关 键 词:Mine tailing tailing dam surface paste disposal geotextile material.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15