铁路专用线高度不足条件下隧道口架梁施工技术研究  被引量:5

Study on the Construction Technique of Girder Erection at Tunnel Portal when the Special Railway Line Is Not High Enough

在线阅读下载全文

作  者:韩鹏 

机构地区:[1]中铁十七局集团铺架分公司,太原030032

出  处:《价值工程》2016年第9期109-114,共6页Value Engineering

摘  要:本文针对专用铁路设计标准偏低、隧道洞口架梁作业高度不足的实际问题,介绍了"降低洞口轨道结构高度和降低架桥机作业高度"的技术改进方案,文中详细分析了此方案的安全性和可行性,通过具体实施收到良好效果,谨供同类工程参考。In view of the problem that the design standard of special railway is low and it is not high enough for tunnel portal girder erection operation, a technical improvement program is proposed, that is to lower the portal track structure height and the bridge girder erection machine working height. This paper analyzed the security and feasibility of this program. Good effects have been obtained after the implementation of the program. This method can provide reference for similar projects.

关 键 词:铁路专线 隧道洞口 T梁架设 技术改进 

分 类 号:U455.3[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象