检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:常文杰
机构地区:[1]中核核电运行管理有限公司,浙江海盐314300
出 处:《科技视界》2016年第8期78-78,64,共2页Science & Technology Vision
摘 要:全范围模拟机是核电厂操纵员培训和考试的主要工具,保证模拟机的安全、稳定运行十分重要。模拟机的交流供电系统作为模拟机设备的动力来源,它的技术性能和质量直接影响模拟机的正常运行。通过对CP600全范围模拟机交流供电系统进行的技术改造,排除了因模拟机长期高负荷运行而产生的缺陷和隐患,提升了模拟机交流供电系统的操作和维护性能。所获得的经验也可供其它核电厂参考。Full scope simulator is used in nuclear power plants operator training and examination. It is very important to ensure the simulator running safely and stably. The capability and quality of the simulator AC power supply system have an great effect in the running of the simulator.Due to technical transformation of CP600 full scope simulator AC power supply system, the problem and hidden trouble had been resolved, and the capability of simulator AC power supply system maintenance had been upgraded. The experience of technical transformation could be used for any other nuclear power plants.
分 类 号:TM623[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28