检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王伟[1,2] 程远平[1,2] 袁亮[1,2] 陈荣柱[3] 王海锋[1,2] 杜凯[4]
机构地区:[1]中国矿业大学煤矿瓦斯治理国家工程研究中心,江苏徐州221116 [2]中国矿业大学安全工程学院,江苏徐州221116 [3]平顶山天安煤业股份有限公司五矿,河南平顶山467000 [4]山东能源枣庄矿业(集团)有限责任公司柴里煤矿,山东枣庄277519
出 处:《煤炭学报》2016年第1期138-148,共11页Journal of China Coal Society
基 金:国家重点基础研究发展计划(973)资助项目(2011CB201204);国家自然科学基金面上基金资助项目(51374204;51474212)
摘 要:为解决深部近距离上保护层开采被保护层大量卸压瓦斯通过底板裂隙涌向首层采煤工作面极易造成瓦斯超限的问题,以平顶山天安煤业股份有限公司五矿为研究背景,采用理论分析、实验室实验、现场考察以及离散元数值模拟的手段,研究了深部近距离上保护层开采底板煤岩层裂隙瓦斯通道演化规律及下被保护层卸压瓦斯抽采时效性。研究表明:回采方向上底板煤岩层可分为原始应力区、卸压增透区和重新压实区,卸压增透区内煤体膨胀变形量大渗透率高,卸压瓦斯解吸扩散,底板采动裂隙使被保护层与采煤工作面贯通形成裂隙瓦斯通道。时间尺度上,卸压增透区的形成与上保护层回采到基本顶来压垮落时间段相对应,采动裂隙瓦斯通道伴随基本顶的破断垮落逐渐重新压实消失,卸压增透区范围在基本顶初次垮落前达最大值,回采推进期间与基本顶来压步距正相关。重新压实区域内煤岩层经历应力加载、卸荷、重新加载后可能出现损伤破坏,卸压瓦斯大量解吸引起煤体收缩变形,部分煤岩体受力比其原始应力更大出现压缩变形。卸压增透区是卸压瓦斯产生及运移的主要空间,也是进行卸压瓦斯拦截及抽采的高效区,瓦斯抽采工程需考虑采动裂隙演化的空间和时间效应。In deeper underground short-distance upper protective seam extraction,substantial amounts of relief gas absorbed in the protected coal seam would influx into the working face of the protective seam through the floor mining-induced fractures,which might cause gas concentration exceeding the statutory limit.This paper takes the 5th Mine of Tianan Coal Co.,Ltd.as a case,and studies the floor fracture evolution and relief gas drainage timeliness in deep underground short-distance upper protective seam extraction,using the methods of theoretical analysis,laboratory test,field survey and 3D distinct element numerical simulation.It concludes that the floor area could be divided into initial stressregion,pressure relived and permeability enhanced region( PRPER),and re-compacted region. In the PRPER,the coal permeability enhancements was accompanied with its swelling,the mining-induced floor fracture became fracture gas channel connecting the protected coal seam to the protective working face.On the time scale,the PRPER occurred during the period between the initial extraction and the collapse of main roof. The fracture gas channel re-compacted and disappeared gradually with the collapse of main roof.During the normal excavation,the area of PRPER held a positive correlation with the periodic weighting,and reached its peak when the preliminary extraction proceeded.In the recompacted region,coal and rock stratum would suffer the stress of loading-unloading-reloading,generating certain damage and failure,and finally contribute to the gas desorption as well as the shrinkage of coal.The PRPER is the primary space that relief gas generates and migrates,and it is thus the target area for highly efficient relief gas drainage.When proceeding gas drainage projects,it is advised to consider the effect of the time-space on the fracture evolution induced by mining.
关 键 词:近距离上保护层 裂隙瓦斯通道 卸压增透区 瓦斯抽采时效性 三维离散元
分 类 号:TD712[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229