强潮河口污水排江竖管冲刷试验研究  

Erosion Experimental Study on Sewage Discharge Standpipe of Strong Tidal Estuary

在线阅读下载全文

作  者:王瑞锋[1,2] 李若华[1,2] 张芝永[1,2] 杨元平[1,2] 

机构地区:[1]浙江省水利河口研究院,浙江杭州310020 [2]浙江省河口海岸重点实验室,浙江杭州310020

出  处:《浙江水利科技》2016年第2期62-64,71,共4页Zhejiang Hydrotechnics

基  金:浙江省科技计划项目(2014F10036);浙江省博士后科研择优资助项目(BSH1502052)

摘  要:为研究强潮河口污水处理厂排江竖管的局部冲刷问题,采用物理模型试验的方法针对不利的洪水、潮流、河床高程等条件,对瑞安江南污水排放口竖管附近局部冲刷坑的冲刷深度、冲刷形态进行了冲刷试验研究。试验得出不利水文条件下的最低冲刷高程及冲刷坑大致形态,冲刷试验成果可作为竖管相关设计的依据。To study local scour of river discharge standpipes of a sewage treatment plant at strong tidal estuary,this paper used physical model tests for adverse conditions such as floods,tidal current and river bed elevation,and conducted experimental study on scouring depth and erosion form of local scour near Rui' an Jiangnan sewage outlet standpipe. The test got the lowest scour elevation and rough scour form under adverse hydrological conditions. The scouring test results can be used as the basis for related standpipe design,and can provide reference to similar projects of strong tidal estuary.

关 键 词:强潮河口 排江竖管 物理模型 局部冲刷 

分 类 号:TV83[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象