检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]Department of Bioenvironmental Systems Engineering, National Taiwan University, Taipei 10617, Taiwan, R. O. C. [2]Department of Public Works, New Taipei City Government, New Taipei City 22001, Taiwan, R.O.C
出 处:《Journal of Civil Engineering and Architecture》2016年第3期309-315,共7页土木工程与建筑(英文版)
摘 要:Based on the experience of emergency operation on earthquake and flooding in local and foreign countries, the secondary disasters of fire, damage of critical infrastructure usually harmed lives or disturbed living condition. In order to safeguard people's lives and property safety, Taoyuan City Government, except for elementary public facilities, added standardized disaster prevention parks and detention ponds in the zone-expropriation project at Chunglu area. The zone-expropriation project at Chunglu, Taoyuan is designed for 487,600 residents in 2021. The area of public facilities of park, school, road and green land is 50.7 ha, 41.88% of total development area of 122.06 ha, in which, the capacity of disaster prevention parks at Chunglu area is designed for 3,164 refugee in 7.54 ha. An underground storage construction, withstand 7-magnitude earthquake, could supply the amount of water consumption of 3 L daily per person, lasting at least four weeks. The capacity of two detention ponds is 87,800 m3. During normal times, the disaster prevention park and detention ponds can be used as a recreational space for residents. When a disaster occurs, shelters are set up in the parks to accommodate residents to protect lives and property. And, detention ponds could adjust outflow discharge into neighborhood drainage system to mitigate disaster happening. Because the construction of standardized disaster prevention park with climate change needs much more land area, the acquisition of private land area is very difficult either general acquisition or zone expropriation in urban area. During each stage of zone expropriation, the support of landlord and Mayor Wu is very important. By means of public participation, information meeting was held hundreds times and revised content according to landlord's positive opinion. Moreover, the design idea and content was discussed with consultant-company mutually from time to time. Fortunately, this project is finished successfully and got award from Public Construction Council of Tai
关 键 词:Taoyuan Chunglu detention pond disaster prevention park climate change
分 类 号:TU984.11[建筑科学—城市规划与设计] P467[天文地球—大气科学及气象学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90