检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]三峡大学水利与环境学院,湖北宜昌443002 [2]三峡大学水电工程施工与管理湖北省重点实验室,湖北宜昌443002
出 处:《水电能源科学》2016年第3期136-139,共4页Water Resources and Power
基 金:国家自然科学基金项目(51379109)
摘 要:针对绩溪抽水蓄能电站土石方调配困难的问题,基于动态规划理论,对绩溪抽水蓄能电站上、下库区的土石方进行动态调配规划,并利用Visual Studio 2010平台仿真其调配运输过程,得到的调配结果符合实际,在满足各填筑部位物料需求的同时,还提高了上坝率,减少了中转率,降低了工程造价。研究成果可为类似工程提供参考。There are many difficulties for earthwork allocation of Jixi pumped storage power station.Based on the dynamic programming theory,the earthwork dynamic allocation planning of up and down reservoirs of Jixi hydraulic engineering was carried out.And then the transportation process of allocation was simulated on the Visual Studio2010 platform.The result is consistent with actual situation.When meeting the material requirements of filling zones,it improved the direct utilization of dams,reduced the transfer rate and project cost.The research result can provide a reference for similar projects.
关 键 词:绩溪抽水蓄能电站 土石方调配 动态规划 VISUAL Studio2010
分 类 号:TV541[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112