检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李志威[1,2] 李艳富[3] 王兆印[2] 胡世雄[1]
机构地区:[1]长沙理工大学水利工程学院,湖南长沙410004 [2]清华大学水沙科学与水利水电工程国家重点实验室,北京100084 [3]南京水利科学研究院,江苏南京210029
出 处:《水科学进展》2016年第1期1-10,共10页Advances in Water Science
基 金:国家自然科学基金资助项目(91547112);水利部公益性行业科研专项经费资助项目(201401063)~~
摘 要:分汊河流的江心洲洲头是分汊河段分水分沙和泥沙冲淤的动态区域,其冲淤过程受来水来沙和地形条件变化呈现冲淤交替。通过几何概化洲头的浅滩逆坡和侧向顺坡,考虑逆坡促淤和顺坡分沙作用,建立洲头浅滩的推移质冲淤的概化模型,推导洲头由淤积转向冲刷的临界流量表达式。上游来流量增加,洲头淤积速率先增加到最大值后逐渐减少,直至达到临界流量,再转向冲刷。洲头淤积速率与上游水面纵比降和床沙粒径成正比,与浅滩逆坡、侧向水面比降与顺坡成反比。若其他条件相同,洲头浅滩形状越不对称和上游来沙量越小,越有利于冲刷。模型预测武汉河段天兴洲的临界流量范围与水文观测值较为接近,对其出现超过某个大临界流量仍出现淤积的特殊性,给出的新解释是天兴洲洲头的整治工程使得在大流量条件下洲头抵抗冲刷和阻挡作用促进泥沙淤积。Head zone of mid-channel bar is a dynamic shoal of water-sediment diversion and alternative erosion-deposition in anabranching river. Erosion-deposition process in bar head relates to water-sediment supply and local topographic condition. Through the geometric generalization of the mid-channel bar head( i.e. longitudinal upslope and lateral downslope),a conceptual model of bedload transport on the bar head is derived using the concept of upslope facilitating deposition and lateral downslope dividing sediment,meanwhile to obtain a critical discharge formula of the erosion-deposition transition. Along with increasing upstream discharge,the deposition rate in bar head increases first up to the maximum value and then gradually decreases,until approaching the critical discharge,and eventually occurring erosion. The deposition rate in the bar head is proportional to the longitudinal channel gradient and bed sediment diameter,inversely proportional to lateral gradient,upslope and downslope. If other conditions are the same,the shape of bar head is more asymmetric with smaller sediment load supply,more beneficial to the erosion. The critical discharge in the Tianxingzhou Island head of Wuhan reach in the middle Yangtze River predicted by this model is roughly in agreement with the hydrological observation. Nevertheless,the Tianxingzhou Island head still occurs to the deposition when the flood discharge surpasses the critical discharge. To this particularity,this study presents a new explanation that the regulation project( i.e. revetment) in the Tianxingzhou Island head plays a pivotal role on resisting the erosion and facilitating the sedimentation in the higher discharge condition.
关 键 词:分汊河流 江心洲 淤积 冲刷 概化模型 临界流量
分 类 号:TV147[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15