建设项目竣工环保验收监测常见问题与对策  被引量:15

Common Problems and Countermeasures for the Environmental Protection Acceptance Monitoring in Completed Construction Projects

在线阅读下载全文

作  者:乐小亮[1] 刘宇麟 倪刘建[1] 潘春龙[1] 李健[1] 

机构地区:[1]泰州市环境监测中心站,江苏泰州225300

出  处:《环境影响评价》2016年第2期67-70,共4页Environmental Impact Assessment

摘  要:建设项目竣工环保验收是检验企业是否执行"三同时"制度的重要手段。通过从资料收集、现场踏勘、验收监测和报告编写等4个方面具体分析建设项目竣工环保验收监测中存在的问题,就如何贯彻执行"三同时"制度提出了几点对策,以期对建设项目竣工环保验收监测提供借鉴。Environmental protection acceptance inspection in completed construction projects is an important method to check whether the company has fulfilled the " three simultaneous" system. This paper analyzes the existing problems with the environmental protection acceptance monitoring in completed construction projects in terms of data collection, onsite survey, acceptance monitoring and reports writing. Some countermeasures were put forward on how to implement the "three simultaneous" system in order to provide reference for environmental protection acceptance monitoring.

关 键 词:建设项目 环境保护 验收监测 对策 

分 类 号:X830[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象