检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁智军
机构地区:[1]中天合创能源有限责任公司葫芦素煤矿,内蒙古鄂尔多斯017317
出 处:《煤矿现代化》2016年第2期95-97,共3页Coal Mine Modernization
摘 要:阐述了巷道底鼓的破坏形式和影响巷道底鼓的主要因素,依据巷道顶底板岩层真实力学参数,通过RFPA数值模拟软件,模拟了巷道进行底锚杆支护前后的底鼓破坏应力应变情况和破坏程度的对比,演示了底锚支护对巷道底鼓的控制作用。现场试验表明,经过底锚支护的巷道4个月后顶底板移近量平均只有179mm,是未支护巷道的1/3,研究结果对底鼓巷道的支护具有一定的参考价值。Describes the damage in the form of the floor heave,and the impact of the main factors the floor heave. Based on roadway roof and floor rock mechanical parameters, by RFPA numerical simulation software,Simulation of the bottom end of t roadway floor heave Bolting situation before and after the destruction of the stress and strain,and contrast levels of destruction. Demonstrates the role bottom anchor retaining control of the floor heave.Field test shows,through the tunnel after the end of the anchor support, roof and floor after moving distance four-month average of only 179 mm. It is no support roadways 1/3. The results have some reference value for floor heave of roadway supports.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.178.2