检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐小龙[1] 姚传勤[1] 白蓉[2] 李闰生[2]
机构地区:[1]安徽理工大学土木建筑学院,安徽淮南232001 [2]中国建筑第四工程局有限公司,广州510665
出 处:《低温建筑技术》2016年第3期106-107,共2页Low Temperature Architecture Technology
摘 要:为防止上一道工序在下一道工序施工遭到破坏,建筑工程常在下道工序施工前铺设保护层的做法,传统保护层一般采用细石混凝土等材料,但此种材料流动性大在坡度较大处施工困难,容易滑落。为满足日常工程建设施工的要求,同时达到减少资源浪费、增加企业经济效益的目的,通过对施工图和方案的优化,采用挤塑泡沫板代替细石混凝土充当防水保护层施工方法,可以取得较好的技术经济效果。In order to prevent the construction procedure, is destroyed by the next procedure, protective layer construction projects often laid before the next working procedure construction practice, the traditional protective layer generally use the materials such as fine aggregate concrete, but the material liquidity is big in construction difficulties, with strong slope slide easily. To meet the requirements of daily for construction projects, to reduce resource waste, increase enterprise economic benefits at the same time, through the optimization of the construction drawing and scheme, we use extruded foam board instead of fine stone concrete as a waterproof protective layer, which and can achieve better technical and economic effect.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.225