双平臂抱杆与特高压输电线路塔耦合结构力学性能分析  被引量:10

MECHANICAL PROPERTY ANALYSIS OF THE COUPLING STRUCTURE OF DOUBLE FLAT-ARM HOLDING POLE AND ULTRA HIGH VOLTAGE TRANSMISSION LINE TOWER

在线阅读下载全文

作  者:吴凡[1] 史跃[2] 黄成云[2] 周焕林[1] 

机构地区:[1]合肥工业大学土木与水利工程学院,合肥230009 [2]安徽送变电工程公司,合肥230022

出  处:《钢结构》2016年第3期59-61,共3页Steel Construction

基  金:国家电网公司交流建设分公司科技项目(SGZB0000JLJS1400072)

摘  要:特高压灵绍线长江大跨越输电线路铁塔具有高、大、重等特点,采用了落地双平臂抱杆对其进行施工。运用有限元方法对工程所用的双平臂抱杆及双平臂抱杆与铁塔的耦合结构进行了力学性能分析,分别得出多种工况下这两种结构的抱杆整体最大位移、最大应力和腰环拉线最大拉力。结果表明:当风向为45°方向时,抱杆处于最不利状态;与单抱杆结构相比,耦合结构中抱杆的最大位移增大,腰环拉线拉力减小。The Yangtze River long-span ultra high voltage transmission line tower of Lingshao has the characteristics of high-rise,large-scale and large-mass. The tower was constructed by grounded double flat-arm holding pole. The mechanical property of the double flat-arm holding pole,as well as the coupling structure of double flat-arm holding pole and trasmission line tower,were analyzed by the finite element method. The overall maximum displacement and stress of the pole,the maximum tension of the girdle cable under a variety of conditions were obtained respectively. The results indicated that 45° wind direction might lead to the most unfavorable state for the pole. Compared with the single pole structure,the maximum displacement of the pole in coupling structure increased,while the maximum tension of the girdle cable decreased.

关 键 词:双平臂抱杆 铁塔 耦合结构 有限元 力学性能 

分 类 号:TU347[建筑科学—结构工程] TU311.3

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象