机构地区:[1]合肥工业大学土木与水利工程学院,合肥230009 [2]安徽送变电工程公司,合肥230022
出 处:《钢结构》2016年第3期59-61,共3页Steel Construction
基 金:国家电网公司交流建设分公司科技项目(SGZB0000JLJS1400072)
摘 要:特高压灵绍线长江大跨越输电线路铁塔具有高、大、重等特点,采用了落地双平臂抱杆对其进行施工。运用有限元方法对工程所用的双平臂抱杆及双平臂抱杆与铁塔的耦合结构进行了力学性能分析,分别得出多种工况下这两种结构的抱杆整体最大位移、最大应力和腰环拉线最大拉力。结果表明:当风向为45°方向时,抱杆处于最不利状态;与单抱杆结构相比,耦合结构中抱杆的最大位移增大,腰环拉线拉力减小。The Yangtze River long-span ultra high voltage transmission line tower of Lingshao has the characteristics of high-rise,large-scale and large-mass. The tower was constructed by grounded double flat-arm holding pole. The mechanical property of the double flat-arm holding pole,as well as the coupling structure of double flat-arm holding pole and trasmission line tower,were analyzed by the finite element method. The overall maximum displacement and stress of the pole,the maximum tension of the girdle cable under a variety of conditions were obtained respectively. The results indicated that 45° wind direction might lead to the most unfavorable state for the pole. Compared with the single pole structure,the maximum displacement of the pole in coupling structure increased,while the maximum tension of the girdle cable decreased.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117