检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨旭波
机构地区:[1]积水潭医院设备科,北京100035
出 处:《医疗卫生装备》2016年第3期118-120,共3页Chinese Medical Equipment Journal
摘 要:阐述了新建医院土建完成后大量设备安装中所遇到的问题,对此提出了应用项目管理方法。根据内装进度合理安排设备安装的进程,并以手术室、放射科、检验科等设备安装为例,解决了新建医院过程中专用设备如何配合内装同步施工的问题。得出了医学工程人员不仅需具备设备的理论知识,而且要掌握管理学知识的结论,这对新医院建设具有重要的指导意义。The problems were described during equipment installation in a new hospital after civil engineering construction was completed. Project management method was applied, and equipment installation was arranged based on the progress of internal fitting, with the equipment installation in operating room, radiology department, clinical laboratory department and etc as examples. The medical engineer has to master the knowledge on equipment and management to contribute to the construction of new hospital.
分 类 号:R197.39[医药卫生—卫生事业管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30