同台换乘地铁站分期实施时的设备房预留问题  被引量:2

Equipment Room Reservation at One-platform Interchange Station

在线阅读下载全文

作  者:纪晓恒 

机构地区:[1]中铁第四勘察设计院集团有限公司,武汉∥助理工程师430063

出  处:《城市轨道交通研究》2016年第4期69-72,共4页Urban Mass Transit

摘  要:同台换乘站在地铁车站设计中较常见,由于两线共用站厅层但一般不同期开通,所以必然会涉及到某些机电系统设备、房间的预留问题。阐述了同台换乘地铁站在两线不同期实施时,隧道通风、通信信号、供电、自动售检票、综合监控、火灾自动报警/环境与设备监控、屏蔽门、给排水与水消防、气体灭火、人防等机电系统是否预留及如何预留的问题。One platform interchange between two subway lines is very normal in metro station design,but the operation of two subway lines are not necessarily to be at the same time even though they may share one hall layer,because it will involve many problems like the reservation of mechanical and electrical equipment,the rooms for other systems etc. In this paper,the reservation for tunnel ventilation, communication signaling,power supply,integrated monitoring,disaster prevention and warning,platform screen door,drainage and fire water supply,civil air defense facilities etc. are discussed in details.

关 键 词:地铁 同台换乘车站 机电配合 预留 

分 类 号:U231.4[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象