检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《湿法冶金》2016年第2期120-124,共5页Hydrometallurgy of China
摘 要:研究了从铜转炉烟灰中回收铜、锌等有价金属。试验结果表明:用稀硫酸浸出烟灰,最佳浸出条件为液固体积质量比5∶1,温度50℃,浸出时间2h,硫酸用量10g/100g烟灰;用Fe粉从浸出液中置换铜,最佳置换条件为过铁系数30%,反应温度40℃,反应时间1h;采用针铁矿法除铁,最佳条件为反应时间4h,反应温度90℃,pH=3;以碱式碳酸锌形式回收锌,锌回收率达98.8%。Recovery of copper,zinc and other valuable metals from copper converter dust was studied.The results shows that the optimum conditions for leaching of copper,zinc and other valuable metals are liquid-to-solid ratio of 5∶1,temperature of 50 ℃,leaching time of 2h,sulfuric acid amount of 10g/100 g dust.The optimum conditions for replacing of copper from the leaching solution are iron powder over coefficient of 30%,temperature of 40 ℃,reaction time of 1h.The iron in replaced solution is removed by goethite method,the best conditions are reaction time of 4h,temperature of 90℃,solution pH of 3.Final,zinc in the solution which iron and copper was removed is precipitated as basic zinc carbonate,zinc recovery rate is 98.8%.
分 类 号:TF811[冶金工程—有色金属冶金] TF813
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.168