机构地区:[1]中国水利水电第七工程局成都水电建设工程有限公司,成都611130 [2]中国电建成都勘测设计研究院有限公司,成都610072
出 处:《黑龙江水利科技》2015年第12期3-6,共4页Heilongjiang Hydraulic Science and Technology
摘 要:叶巴滩水电站位于金沙江干流上游,系金沙江上游13个梯级水电站的第7级。电站采用坝式开发,双曲拱坝,最大坝高217.0m,电站总装机容量为2285MW。在研究了截流时段、截流标准、截流方式、截流方案及截流布置的基础上,分析了河床截流难度,推荐了单戗堤、单向立堵进占得截流规划设计方案。Yebatan station is located on the upper reaches of the main Jinsha River,the seventh level of13 casecade power stations on the upstream of the Jinsha River,and the power station belongs to dam type development,double curvature arch dam with the maxmum dam height of 217. 0 meters and total installed capacity of power station of 2285 MW. Based on the study on closure time,standard,way,scheme and layout in the paper,by analyzing the difficulty of river-bed closure,the scheme of single berm and one-way closure planning and design is recommoned.
关 键 词:截流 截流时段及标准 截流方式 截流方案 规划设计
分 类 号:TV551.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.114