大断面隧道高压富水变质岩地层及构造带灾害处理技术——以旧堡隧道为例  被引量:3

Countermeasures for Disaster of High-pressured Water-rich Metamorphic Strata and Tectonic Zone of Jiubao Large Cross-section Tunnel

在线阅读下载全文

作  者:孟庆余[1] 苏江[1] 方伟[1] 

机构地区:[1]铁道第三勘察设计院集团有限公司,天津300251

出  处:《隧道建设》2016年第3期315-319,共5页Tunnel Construction

摘  要:旧堡隧道地处区域性构造交汇部位,地层为古老的太古界变质岩,岩石因受多期地质构造运动作用,断裂构造极为发育。隧道地下水发育且部分地段存在承压水,在施工过程中,针对掌子面突水涌碴、开挖面坍塌,采取架设临时仰拱和临时挡墙措施,加固绕避;针对初期支护大变形、二次衬砌开裂等情况,采取超前注浆、超前大管棚和双层初期支护等措施,确保隧道衬砌结构安全;针对隧道地下水发育情况,采用排水型防水板、边墙增设碎石盲沟并增加泄水洞等措施,确保隧道运营安全。Jiubao tunnel is located in the junction of regional tectonic whose main strata is old archaeozoic metamorphic rocks. The fault structure is developed well due to the geological structural movement. The groundwater is rich; and there is confined water in partial sections. Technologies,such as the temporary inverted arch,the temporary retaining wall,strengthening and avoidance are used so as to solve the water inrush and collapse of tunnel face. In order to guarantee the safety of tunnel lining structure,advance grouting,advance pipe roof and double primary support layers are adopted. In light of the rich groundwater,the drainage-type waterproofing plate,additional macadam blind drains and increasing drainage holes are adopted to guarantee the running safety of the tunnel.

关 键 词:铁路隧道 承压水 突水涌碴 大变形 泄水洞 

分 类 号:U455[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象