某商住楼剪力墙混凝土置换处理  被引量:5

Replacement treatment of concrete shear wall of residential building

在线阅读下载全文

作  者:王健[1] 姜超[1] 

机构地区:[1]辽宁工程技术大学建筑工程学院,辽宁阜新123000

出  处:《辽宁工程技术大学学报(自然科学版)》2016年第5期504-508,共5页Journal of Liaoning Technical University (Natural Science)

摘  要:为解决剪力墙结构混凝土处理中采用分期置换法剔除原墙体对结构的影响问题,采用有限元分析的方法,研究不同开洞尺寸对结构的影响.结果表明:不同开洞尺寸会对结构产生不同程度的变形、裂缝等影响;将开洞对结构造成的影响与实际施工时条件影响综合考虑,得出最佳开洞尺寸及开洞间距,实现置换混凝土墙体的优化设计.To solve the problem of the influence of stage replacing method to remove wall on structure in treatment concrete of shear wall structure, this paper studied the effects of different hole size on the structure by using the finite element method. The results show that different hole size will have an impact on different degree of deformation and crack on the structure. Considering the effects of openings on the structure and the actual construction conditions, the best hole size and hole spacing are obtained, which optimized the design of replacement of the concrete wall.

关 键 词:分期置换 结构加固 剪力墙开洞 优化设计 有限元分析 

分 类 号:TU746[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象