下屯拱坝右坝肩K_6溶洞影响分析及处理方案研究  

Research on the impact analysis of Xiatun arch dam right abutment K_6 karst cave and treatment plan

在线阅读下载全文

作  者:王国香 钱刚 

机构地区:[1]贵州中水建设管理股份有限公司,贵州贵阳550002

出  处:《中国水能及电气化》2016年第3期66-69,共4页China Water Power & Electrification

摘  要:下屯水电站右坝肩在1140-1160m高程发育K6溶洞,洞内黏土夹块石充填,溶洞规模较大,对拱坝坝肩的稳定不利。经分析溶洞对拱坝坝肩及下游岩体稳定的影响较小,但为了提高坝肩的安全可靠性,对溶洞进行了清挖,并回填混凝土及设置了混凝土重力墩。本文对此加以介绍。K_6 karst cave is developed in 1140 - 1160 m elevation of Xiatun arch dam right abutment. The cave is filled by clay and stones. The karst cave has larger scale,which is not beneficial for the stability of dam abutment. The karst cave has lower influence on the stability of dam abutment and downstream rocks according to analysis. The karst cave is excavated in order to improve the safety and reliability of the abutment. Concrete is backfilled,and concrete gravity pier is set. The above measures are introduced in the paper.

关 键 词:拱坝坝肩 溶洞 重力墩 

分 类 号:TV642.4[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象