检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:牛东晓[1] 李建锋[1] 魏林君[2] 迟永宁[2]
机构地区:[1]华北电力大学经济与管理学院,北京市昌平区102206 [2]中国电力科学研究院,北京市海淀区100192
出 处:《电网技术》2016年第4期1087-1093,共7页Power System Technology
摘 要:目前我国风电并网容量位居世界第一。风电出力的波动性和间歇性使得大规模风电并网要求电力系统留有足够的备用和调峰电源,因此未来电网面临着风电消纳、接入方式及送出通道等方面的挑战。综合考虑网架约束、跨区电力交换以及系统调峰容量等因素,基于时序生产模拟方法,研究了跨区电网风电消纳能力分析模型以及评估方法,提出了提高跨区电网风电消纳能力的措施。最后,以某跨区电网为算例进行分析,验证了所提方法和措施的有效性。At present, China has most integrated capacity of wind power in the world. Fluctuation and intermittence of large wind power output require more reserve and balancing capacity, bringing challenges of accommodation, integration options, sending out channel to the power system. This paper focuses on analysis on technical factors, taking network constraints, trans-provincial power exchange and balancing capacity into consideration. Accommodating model and calculating method are studied in depth based on time sequential production simulation. Countermeasures for improving integration capacity are presented. Finally, method and countermeasures are verified with a trans-provincial grid as example.
分 类 号:TM711[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117