检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《探矿工程(岩土钻掘工程)》2016年第4期80-82,87,共4页Exploration Engineering:Rock & Soil Drilling and Tunneling
摘 要:沿海地区第四系覆盖层,上部软土地层主要为粘性土。钻孔灌注桩在釆用潜水钻机成孔过程中,上部软粘土对成孔质量和最终成桩质量的影响都很大。潜水钻机成孔过程中出现的质量问题主要有桩顶冒水、桩身夹泥、缩径、露筋、糊钻、成孔垂直度差等,分析了产生这些质量问题的原因。总结潜水钻机在粘土中成孔控制的技术要点,包括施工准备阶段、施工阶段、清孔阶段的控制,以及其他措施。The upper soft soil layer is mainly cohesive soil in coastal quaternary overburden layer,which has great effects on the hole and the final pile quality in the drilling process of submersible drill. The quality problems are water emitting from the top of pile,mud mixed in pile body,diameter shrinkage,reinforced steel exposing,bit balling and hole verticality deviation,and these related causes are analyzed. The paper summarizes the key points of boring control technology by submersible drill in clay,including the control in construction preparation stage,construction stage and hole cleaning stage,as well as other measures.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15