应对区外来电比例提高的省内外电源协调运行机制  被引量:6

Operating Mechanism of Inter-province Generation Sources for Coping with the Increase of Power from Outside

在线阅读下载全文

作  者:卫鹏[1] 刘建坤[1] 刘国平[2] 王岗[2] 

机构地区:[1]江苏省电力公司电力科学研究院,江苏南京211103 [2]江苏省电力公司,江苏南京210024

出  处:《江苏电机工程》2016年第2期11-15,共5页Jiangsu Electrical Engineering

基  金:2014年国家电网总部管理指南项目

摘  要:为更好地应对大功率区外来电对电网调度和安全稳定运行的影响,在分析了江苏电网区外来电现状的基础上,从发用电平衡面临新的压力、省内电源调节压力增大和发电利用小时数偏低等方面研究了内外电源协调运行面临的主要问题,提出了调节义务分摊机制和辅助服务补偿机制等内外电源协调运行机制。In order to cope with the impact of large power from outside on the power grid scheduling and safe and stable operation, the current situation of power from outside for Jiangsu Power Grid has been analyzed. Based on the analysis, from the aspects of power balance, increase of power from outside and low utilization hours of power generation, the main problems facing the coordination between inside and outside generation sources have been studied. The power regulating obligation sharing mechanism and the ancillary services compensation mechanism have been proposed for coordinating the operation of generation sources.

关 键 词:区外来电 调峰 电力电量平衡 电源 协调运行 

分 类 号:TM732[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象