HVDC换流站闭锁事故分析及改进措施  被引量:4

Analysis of a HVDC Converter Station Forced Blocking Accident and Improvement Measures

在线阅读下载全文

作  者:涂叶露 陈志刚 朱锐[1] 王新想 

机构地区:[1]国家电网公司运行分公司上海管理处,上海200000 [2]重庆万盛煤化有限责任公司,重庆400805 [3]南京国臣信息自动化技术有限公司,江苏南京211100

出  处:《供用电》2016年第3期25-28,33,共5页Distribution & Utilization

摘  要:某高压直流输电(HVDC)换流站发生闭锁事故,事故是由于阀冷系统循环水泵变频器不具备高低电压穿越能力造成的。根据循环水泵的启动运行方式及变频器AC/DC/AC的特性,从变频器的直流环节入手,提出基于直流支撑技术的低电压穿越改进技术,通过直流支撑系统和变频器直流环节的改造还可以实现变频器的高电压穿越。The causes of a HVDC converter station forced blocking accident are found out,which are the frequency converter of water circulating pump in valve cooling system without the capability of high and low voltage ride through capabilities. According to the starting and operation modes of water circulating pumps and AC/DC/AC characteristics of frequency converter,measures to improve the low voltage ride through capability of frequency converter based on DC support technology is put forward.Meanwhile,high voltage ride through capability could be achieved by the reconstruction of the DC support system and the DC link of frequency converter.

关 键 词:换流站 闭锁 变频器 直流支撑技术 高电压穿越 低电压穿越 

分 类 号:TM721.1[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象