武钢2号筛焦楼振动原因分析及处理  

Causes analysis and treatment for vibration of No.2 coke screening building in WISCO

在线阅读下载全文

作  者:朱志永[1] 徐燕丽[2] 金辉 彭国樑[1] 

机构地区:[1]武钢联合焦化公司,湖北武汉430082 [2]湖北水利水电职业技术学院,湖北武汉430070 [3]河南省建筑职业技术学院,河南郑州450000

出  处:《武钢技术》2016年第2期46-48,共3页Wisco Technology

摘  要:武钢焦化公司2号筛焦楼在振动筛运行期间振动过大,经分析发现该结构异常的竖向振动是由振动筛激振力所引起,且振动筛所在区域的梁板刚度明显不足,为此对振动筛所在区域的梁板构件进行加固,以提高结构构件刚度,控制振动。加固实施完成后,整个楼面无明显振动感觉,达到了预期的减振效果。No.2coke screening building vibrated excessively during the running of vibrating screen in Wuhan Pingmei WISCO United Coking Corp Ltd.It analyzed that abnormal vertical vibration of the structure was caused by the excitation force of vibrating screen,and rigidity of the beam-slab was not enough in vibrating screen area.Therefore the beam-slab has been reinforced to improve the stiffness of components,then control the vibration.No obvious vibration appeared after the strengthening,the floors reached the expected effect of vibration reduction.

关 键 词:筛焦楼 振动速度 振动频率 减振处理 

分 类 号:TQ520.5[化学工程—煤化学工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象