基于炮掘法的硬岩快速掘进设备配置研究  被引量:3

Device Configuration of Rapid Excavation Based on Blasting Method for Hard Rock Roadway

在线阅读下载全文

作  者:李国辉[1] 李基[1] 吴婕萍 吴鑫[1] 

机构地区:[1]四川师范大学工学院,成都610101

出  处:《煤矿机械》2016年第4期124-126,共3页Coal Mine Machinery

基  金:四川省教育厅一般项目(14ZB0030);四川省安监局安全生产科技攻关项目(scaqjgjc_stp_20150011);四川师范大学"251重点人才培养工程"项目;四川师范大学2013年度校级重点培育课题

摘  要:针对f>8硬岩工程地质条件,提出了基于炮掘法的设备选型和配置的经验理论。该理论建立了循环进尺与岩性、炮眼深度之间的数学模型,构建了破、装、运等设备的选型和配置方面的数学模型。鲁班山北矿运输大巷的生产实践表明,该理论创造了硬岩巷道最高月进尺433 m、平均月进尺400 m、平均工效4.17 m/(月·人)的技术水平。According to engineering geological conditions of hard rock f〉8, experience theories of equipment selection and configuration are proposed based on blasting method. Mathematical models among cyclic-footage, rock types and borehole depth, mathematical models about selection and configuration of equipment for breaking, loading, transportation processes, are established in the theories. The practice in +475 in level main transportation roadway of Lubanshanbei mine shows that the theories created the new levels which have the highest monthly footage 433 m, average monthly footage 400m, and an average efficiency 4.17 m/(month.person).

关 键 词:硬岩 巷道 炮掘法 快速掘进 

分 类 号:TD263.2[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象