检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国石化青岛液化天然气有限责任公司
出 处:《油气储运》2016年第4期444-448,共5页Oil & Gas Storage and Transportation
摘 要:LNG槽车外输成为LNG接收站重要的运输环节,针对LNG槽车外输最关键的装备装车橇在测试验收及试运行中存在的问题,以山东LNG槽车装车橇为例,根据LNG槽车装车橇的结构特点、安装模式和应用现状,对装车橇出厂前管道的压力试验、气密性测试、低温试验和控制仪表测试应注意的问题进行了分析,并对装车橇试运行过程中可能出现的泄漏、超压、通讯故障等提出了解决方法,为今后LNG槽车装车橇的系统选型和出厂验收提供参考,同时也为完善装车橇试运行方案及安全运行提供可借鉴的思路。The outer transportation LNG tanker has become an important part of transportation at LNG terminal. There are some problems existing in the acceptance test and commissioning of skid-mounted LNG tanker loading facility. Taking the skid-mounted LNG tanker loading facility in Shandong Province as an example, according to its structural features, installation mode and application status, this paper analyzes the issues that should be concerned in pressure test, air tight test, low temperature test, and control instrument test of pipeline before the skid-mounted loading facility leaves the factory. In addition, solutions are given to the possible problems in commissioning, including leakage, overpressure and communication fault, which can provide reference for the system selection and factory acceptance of skid-mounted loading facility in the future and also provide idea to complete the commissioning scheme and safety operation of skid-mounted LNG tanker loading facility.
关 键 词:LNG 槽车 装车橇 结构形式 流量调节 测试验收 试车
分 类 号:TE832[石油与天然气工程—油气储运工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222