矿井开采沉陷后最终地形等高线的生成及应用  

Generation and application of contour lines in the final topography after mining subsidence

在线阅读下载全文

作  者:张磊[1] 神克强 王中亮[1] 

机构地区:[1]煤炭工业济南设计研究院有限公司,山东济南250031 [2]中煤科工集团武汉设计研究院有限公司,湖北武汉430064

出  处:《山东煤炭科技》2016年第4期141-143,共3页Shandong Coal Science and Technology

摘  要:煤炭开采对地面设施的影响不仅与开采引起的地表相对变形量有关,还包括下沉值与原始地形、既有变形的叠加影响有关。本文提出了以"建立初始地形矩阵—开采沉陷值矩阵预计—矩阵相加运算"为主线,生成井下煤炭资源开发后地面最终地形等高线图的技术路线,并结合不同的情况总结了不同的具体操作方法。The influence of coal mining on the ground facilities is not only related to the relative deformation of the ground surface, but also the influence of the subsidence value and the original terrain,the occurred deformation, the technical route that establishs the initial terrain matrix- mining subsidence value matrix- matrix addition operations "as the main line, generates underground coal resources development after final surface topographic contour map of is put forward, and combining different conditions, summed up the different specific operation method in this paper.

关 键 词:开采沉陷 地形矩阵 下沉矩阵 插值运算 

分 类 号:P208[天文地球—地图制图学与地理信息工程] P642.26[天文地球—测绘科学与技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象