检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]太原理工大学采煤工艺研究所,山西太原030024
出 处:《煤矿安全》2016年第4期161-164,共4页Safety in Coal Mines
摘 要:针对同煤三矿工作面回风巷受采动影响及邻近采空区影响,顶底板移近量大、两帮片帮严重的情况,在分析矿压显现机理及其影响因素的基础上,结合理论分析和现场实测情况,对顶板及煤柱帮提出采用深浅孔注浆的治理方案,并通过FLAC3D软件模拟了回采时及注浆后巷道位移变化情况。结果表明:注浆加固后,巷道总变形量明显减小,顶板下沉量小于400 mm,两帮相对移近量小于300 mm,巷道变形量满足回采期间巷道使用要求。According to the situation of large roof to floor convergence and serious rib spalling of return air roadway influenced by mining and its adjacent goaf in the third coal mine working face in Datong Coal Mine Group. On the base of analyzing the mechanism and its influencing factors of mine pressure behavior,combined with the theory analysis and field measurement,we control the roof and pillar by the method of depth hole combined with shallow hole grouting. FLAC3 Dwas adopted to simulate the changes of the displacement of roadway during mining and after grouting. The results show that after grouting reinforcement,the total deformation of roadway was decreased,the roof subsidence is less than 400 mm,the amount of two- side convergence is less than 300 mm,and the roadway deformation meets the mining requirements.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28