黄山铜镍矿自然崩落法拉底顺序数值模拟分析  被引量:8

Numerical Simulation on the Undercutting Order of the Natural Caving Method in Huangshan Copper-nickel Mine

在线阅读下载全文

作  者:李永辉[1] 张新华 王海文 江飞飞[1] 

机构地区:[1]长沙矿山研究院有限责任公司,湖南长沙410012 [2]新疆亚克斯资源开发股份有限公司,新疆哈密市839000

出  处:《矿业研究与开发》2016年第3期21-25,共5页Mining Research and Development

摘  要:黄山铜镍矿30#矿体采用自然崩落法开采,在前期原岩应力测试、工程地质调查、可崩性分析、块度分析等研究成果的基础上,用三维离散单元程序3DEC对该矿体采用不同拉底方案开采的崩落规律进行了模拟,研究整个崩落过程中的应力与位移的变化情况,从而确定合理的拉底方案和拉底顺序,对现场实际开采具有指导意义。The natural caving method was used to mine the30#orebody in Huangshan Copper-nickel Mine.Based on the results of the original rock stress test,the engineering geological investigation,the caving analysis and the lumpiness research,the caving rules of orebody with different undercutting schemes were simulated by 3DEC.The changes of stress and displacement during caving were studied to determine the reasonable undercutting scheme and order,which had guiding significance for the actual mining.

关 键 词:自然崩落法 崩落规律 拉底顺序 数值模拟 

分 类 号:TD853.364[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象