摘 要:In flexible job-shop batch scheduling problem, the optimal lot-size of different process is not always the same because of different processing time and set-up time. Even for the same process of the same workpiece, the choice of machine also affects the optimal lot-size. In addition, different choices of lot-size between the constrained processes will impact the manufacture efficiency. Considering that each process has its own appropriate lot-size, we put forward the concept of scheduling with lot-splitting based on process and set up the scheduling model of lot-splitting to critical path process as the core. The model could update the set of batch process and machine selection strategy dynamically to determine processing route and arrange proper lot-size for different processes, to achieve the purpose of optimizing the makespan and reducing the processing batches effectively. The experiment results show that, comparing with lot-splitting scheduling scheme based on workpiece, this model optimizes the makespan and improves the utilization efficiency of the machine. It also greatly decreases the machined batches (42%) and reduces the complexity of shop scheduling production management.In flexible job-shop batch scheduling problem, the optimal lot-size of different process is not always the same because of different processing time and set-up time. Even for the same process of the same workpiece, the choice of machine also affects the optimal lot-size. In addition, different choices of lot-size between the constrained processes will impact the manufacture efficiency. Considering that each process has its own appropriate lot-size, we put forward the concept of scheduling with lot-splitting based on process and set up the scheduling model of lot-splitting to critical path process as the core. The model could update the set of batch process and machine selection strategy dynamically to determine processing route and arrange proper lot-size for different processes, to achieve the purpose of optimizing the makespan and reducing the processing batches effectively. The experiment results show that, comparing with lot-splitting scheduling scheme based on workpiece, this model optimizes the makespan and improves the utilization efficiency of the machine. It also greatly decreases the machined batches (42%) and reduces the complexity of shop scheduling production management.
关 键 词:flexible job shop scheduling with lot-splitting batch scheduling strategy based on process scheduling scheme based on workpiece different lot-sizing
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...