机构地区:[1]中交天津港湾工程研究院有限公司港口岩土工程技术交通行业重点试验室天津市港口岩土工程技术重点试验室,天津300222
出 处:《地震工程学报》2015年第B12期214-217,共4页China Earthquake Engineering Journal
摘 要:传统的水下强夯工艺无法实现短时间内无死角地夯实块石抛填层,采用水下振动压实的方法对港珠澳大桥工程中水下块石基床进行压实整平,在国内尚属首例。由于工程实例较少,在现场实施前需进行理论分析。本文将块石抛填层和振动压实系统的模型进行简化,并建立振动方程,通过数学推导给出水下振动压实系统对块石抛填层的做功公式。研究结果表明水对振动压实方法做功的削弱作用很小。At the site of the Hong Kong-Zhuhai-Macao bridge project,the underwater stone bed needed compaction.However,conventional underwater dynamic compaction could not be used to tamp the scattering-filling rubble stone layer with no dead angle over a short period of time.Thus,vibrating compaction technology was used underwater for the first time in China.Owing to the scarcity of engineering examples,theoretical analysis was needed prior to field application.In this study,rubble stone layers and vibration systems were simplified to a mechanical model.The vibration equation was established,and through strict mathematical deduction,the vibration system's work on the rubble stone was obtained.The results show that the weakening effect of water on vibration compaction is very poor.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.106