泄洪洞工作闸室及陡坡明渠段体型优化数值模拟  被引量:3

Numerical Simulation of Working Chamber of Flood Discharging Tunnel and Open Channel

在线阅读下载全文

作  者:党彦[1] 王炳军[2] 李红梅[1] 陈刚[3] 

机构地区:[1]青岛滨海学院建筑工程学院,山东青岛266555 [2]山东科技大学土建学院,山东青岛266590 [3]安康学院,陕西安康725000

出  处:《水利与建筑工程学报》2016年第2期163-166,共4页Journal of Water Resources and Architectural Engineering

摘  要:对九甸峡水电站右岸泄洪洞工作闸室,包括圆直段、圆变方段、方洞段、弧形闸门段、渐变段和明渠段流场进行了数值模拟。获得了水面线、压力、空化数、流速等水力要素。成功捕捉到了压力洞出口处的水翅、突扩跌坎处侧空腔和底空腔。计算结果与实测数据符合较好,根据计算结果,提出了能解决原方案负压区严重和明渠陡坡空蚀破坏问题的泄洪洞体型修改方案。The numerical simulation of Jiudianxia hydropower station fight bank spillway tunnel working chamber was carried out. The simulated area covers the working chamber of flood discharging tunnel, round-straight region, round changing square region, square hole region, tainter valve region, transition region, and open channel section. The obtained hydrodynamic characters include the depth of flow, pressure distribution, variation of cavitation, velocity distribution and the velocity distribution along the flood discharge tunnel. Water-wing, sudden enlargement drop-sill, side cavity and bottom of the cavity have been successfully obtained. Comparison between the numerical results and model test data shows a satisfactory agreement. Based on these results, some suggestions which can successfully solve the burden problems and the cavitation erosion have been proposed for the modification of the spillway tunnel.

关 键 词:泄洪洞 数值模拟 VOF法 水翅 空腔 体型优化 

分 类 号:TV135.2[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象