检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]泰安市水利勘测设计研究院,山东泰安271000 [2]泰安市水利和渔业局,山东泰安271000
出 处:《水利建设与管理》2016年第4期5-8,共4页Water Conservancy Construction and Management
摘 要:本文主要介绍在胜利水库北迎主坝除险加固工程中,根据大坝地质条件,通过加固方案比较,选用多头和单头小直径搅拌机联合施工构筑水泥土防渗墙的施工工艺,并通过适宜的施工工序和方法,严格控制施工质量,成功解决了大坝渗流稳定问题。试验检测证明,各项施工技术指标均满足相关规范和设计要求,大坝防渗体达到了设计标准。The construction process of jointly constructing cement-soil cut-off wall by multi-head and single-head small diameter blenders is selected in risk removal and reinforcement project of Shengli Reservoir Beiying main dam according to the geological conditions of dam through strengthening plan comparison. Construction quality is strictly controlled through suitable construction procedures and methods. The construction quality is strictly controlled. Dam seepage stability problem is successfully solved. Test results prove that all construction technical indicators can meet relevant specifications and design requirements,and the dam anti-seepage body reaches the design standards.
分 类 号:TV543[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28