穿越复杂地层长距离水平曲线顶管施工技术  被引量:2

Long Horizontal Curve Pipe Jacking Construction Technology in Crossing Complex Formation

在线阅读下载全文

作  者:皮青云 

机构地区:[1]黄石精武项管工程有限公司

出  处:《非开挖技术》2016年第2期86-89,共4页China Trenchless Technology

摘  要:滨河路污水管道工程是南阳市排污、治理环境关键控制性工程,采用土压平衡顶管施工工艺,穿越河流、道路、避开房屋采取长距离曲线顶管施工。主要穿越地层为粉质粘土层、细砂层、中粗砂层、砾石层、鹅卵石层、鹅卵石夹砂层等多种土层。最长顶管曲线段为500m;曲率半径1037m;管径2200mm。Binhe road sewage pipeline engineering is a key controlling engineering of Nanyang's sewage pipeline and environmental governance. Using the earth pressure balance pipe jacking, crossing rivers, roads, to avoid those buildings, a long curve pipe jacking construction has been finished. Mainly crossing the stratum of silty clay layer, fine sand, coarse sand, gravel, cobble layer, pebbles with sand and so on. The longest pipe-jacking curve segment is 500 m, 1037m radius of curvature, diameter of 2200 mm.

关 键 词:长距离 水平曲线 砾石层 鹅卵石层 穿越河流和道路 

分 类 号:TU753.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象