小型水库除险加固技术审查若干要点及思考  被引量:1

Thinking Some Key Points about Danger Removal and Reinforcement Projects of Unsafe Small Reservoirs in Technical Examination

在线阅读下载全文

作  者:欧阳建[1,2] 彭海波[3] 

机构地区:[1]武汉大学水利水电学院,武汉430072 [2]广东省水利电力勘测设计研究院,广州510635 [3]广东省水利水电科学研究院,广州510610

出  处:《中国水利》2016年第8期28-30,44,共4页China Water Resources

摘  要:在开展小型病险水库除险加固前期技术审查工作时,发现防洪安全分级、输水涵管明满流运行、库容系数异常和正常使用年限的确定等4个问题需要引起注意。这4个问题具有一定的隐蔽性,在前期工作中易出错或被忽视。现结合小型水库的实际情况,在分析技术规范内涵和相关学术成果的基础上,对上述问题提出了技术审查中的解决方案。When carry out technical examination which is for danger removal and reinforcement projects of unsafe small reservoirs in early work,we find some matters,main including classification of flood safety, operation of culvert under free-surface-pressure flow,abnormity of storage factor,determination of rational service life,etc. These matters are so obscure that people easily error neglect during the early work. Connecting with the practical situation of small reservoir, this paper analyses cases based on content of related codes and academic achievements and then introduces solutions, which are also adopted in our work of technical examination.

关 键 词:小型水库 除险加固 防洪安全分级 明满流 库容系数 合理使用年限 

分 类 号:TV697.3[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象