检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘斌[1]
机构地区:[1]湖北省水利水电科学研究所,湖北武汉430070
出 处:《武汉大学学报(工学版)》2002年第4期60-63,共4页Engineering Journal of Wuhan University
摘 要:通过数学规划的方法对抽水蓄能电站引水系统的经济洞径进行优选 。In regular engineering practice,the diameter sequence of power tunnel is conventionally determined with the method of alternatives comparison,but the result may not be the optimal one.In this paper,factors influencing the diameter of power tunnel for pumped storage power plant are considered and the objective function is obtained.With the method of nonlinear programming,computer programme in common use for power tunnel optimization of pumped storage power plants is designed and the result turns to be satisfactory.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.140.250.157