检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姜太荣[1] 张翼虎[1] 王亮[1] 于彬[1] 张元良[1] 刘家彬[2]
机构地区:[1]江苏科能电力工程咨询有限公司,江苏南京210036 [2]东南大学土木工程学院,江苏南京210096
出 处:《施工技术》2016年第9期84-88,共5页Construction Technology
摘 要:结合河北武强220k V变电站承载重型GIS设备屋面防水工程的特殊要求,从屋面混凝土结构抗裂优化设计、屋面混凝土施工和屋面防水层施工综合技术3个方面,采用建模分析、优化结构设计、试验研究确定防水设计方案,通过严格、合理的综合施工技术措施,较好地解决了重载屋面的开裂渗水问题。Combining with the special requirements of 220 k V substation in Hebei Wuqiang bearing heavy GIS equipment of roof waterproof engineering,optimization design from the roof concrete structure crack,roof concrete construction and roofing waterproof layer construction technology are analyzed. The waterproof design scheme is determined by the modeling analysis,the optimum structure design and the experimental study. Through the strict and reasonable comprehensive construction technology measures,the problem of the crack and seepage of heavy load roof is solved.
关 键 词:防水工程 变电站 屋面 混凝土结构 设计 施工技术
分 类 号:TU761.11[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.82.191