检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国矿业大学矿业工程学院煤炭资源与安全开采国家重点实验室,江苏徐州市221116
出 处:《矿业研究与开发》2016年第4期82-85,共4页Mining Research and Development
基 金:国家重点基础研究发展计划(973计划)资助项目(2013CB227905);"青蓝工程"资助项目(2014)
摘 要:针对布尔台矿区原42102大采高综采工作面矿压显现强烈,煤壁片帮深度大,工作面液压支架前漏矸、漏顶严重等问题,采用FLAC3D数值模拟方法,对比分析了42102工作面在综放开采和大采高综采两种开采模式下的矿压显现规律,结果表明:综放开采可以有效降低煤壁片帮,并且采高越小,煤壁片帮值越小,采高3.5 m综放开采的煤壁片帮量仅为采高5 m大采高综采的65%左右,且顶板下沉量仅为综采的20%~30%。在42102工作面改为综放开采后,经现场实测:综放工作面煤壁片帮程度较大采高综采减小了50%,未出现漏矸、漏顶和冒顶现象,工作面支架工作状态良好,控顶效果良好。The 42102 working face in Buertai mining area,which was originally mined by fully mechanized mining with large mining height,had strong strata behavior,deep rib spalling,and severe gangue leakage and roof leakage before hydraulic supports. According to these problems,FLAC3 Dnumerical simulation was put forward to compare and analyze the strata behaviors under fully mechanized top-coal caving mining method and fully mechanized mining with large mining height. The results showed that the rib spalling could be effectively reduced by fully mechanized top-coal caving mining method,and the smaller the mining height was,the smaller the rib spalling value would be. The rib spalling value of fully mechanized top-coal caving mining with mining height of 3. 5 m equaled to about 65% of fully mechanized mining with large mining height of 5 m. Meanwhile,the roof subsidence of top coal caving method was only 20% ~ 30%of that in original method. After the mining method changed in42102 working face,the field measurements showed that the rib spalling of fully mechanized top-coal caving mining reduced by50% compared with original mining. The gangue leakage,roof leakage and roof falling didn't appear anymore,in other words,the support had been in good working condition,and the roof can well be controlled.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.153.154