检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海市城市建设设计研究总院,上海200125
出 处:《建筑结构》2016年第10期107-111,共5页Building Structure
摘 要:归纳总结装配整体式框架-现浇剪力墙结构常用的技术经济指标。以一栋装配整体式框架-现浇剪力墙结构住宅为例,分析不同预制方案时的结构预制率、混凝土量、含钢量等,进而对不同预制方案下的材料用量进行比较分析,找出影响材料成本增加的主要因素,并得出材料成本与预制率之间的关系。另外,通过对不同预制方案下结构预制率的分析,给出不同预制率时的推荐预制方案,可为同类型结构设计做参考。Technical and economic indices of monolithic precast concrete frame-cast-in-situ shear wall structure were introduced. For one real monolithic precast concrete frame-cast-in-situ shear wall structure residential, comparative analyses of technical and economic indices with different precast schemes including precast rate,concrete quantity,steel content,etc. were carried out,so as to find out the main factors that affect the cost of the materials and the relevance between cost of the materials and precast rate. Precast schemes with different precast rate were recommended,which can be references for the same type of structure design.
关 键 词:装配整体式框架-现浇剪力墙结构 技术经济指标 预制率 含钢量 材料成本
分 类 号:TV334[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.95.53